Dekso 5

Product Description
Matt 100 % acrylic wall paint. Recommended for premises with high functional and special aesthetic requirements that are exposed to some dirt and wear and tear.- Wall paint
- Low gloss
- Extra robust surface
Usage
Living rooms, corridors, entrance areas, offices, kitchens, washrooms, clinics and retail shops.Concrete, lightweight concrete, plaster, bricks, gypsumboards, fiber plaster, cement fiber boards, cement particle boards.
Substrate
Must be clean, dry, solid and suitable for surface treatment.Treatment
Remove loose material and paint by cleaninng and sanding.Remove dirt, grime, grease and chalking materials with Fluren 37.
Water blotches or surfaces stained by nicotine or soot must be cleaned with Fluren 49 and treated with Stop Primer.
Hard, smooth surfaces should be sanded matt and painted with Fix Primer as required.
Cracks, unevenness and holes must be spackled.
Absorbent and porous substrates must be primed with Flügger Sealer
Priming is done with Combi Primer or Special Primer.
Apply 1-2 times. Some colours require an extra treatment.
Application
Brush, roller or sprayDecide your choice of tool/utensil depending on the finish
Apply wet on wet and finish by brushing/rolling in the same direction
Always use the same batch number on contiguous/unbroken surfaces
Differences in surface structure can result in colour deviation
Cold/heat can affect the viscosity of the material
Material temperature for spray painting, min. 12⁰C
Condensation during drying/curing must not occur.
Cold and increased humidity extends drying time, full curing and recoat interval
Increased temperature and low atmospheric humidity reduce drying time and full curing
Always perform a test treatment for a check and acceptance of adhesion and result
Environmental information
Clean off the paint from tools and wash them with water. Bring remains of fluent paint to the local recycling centre. Minimize your paint waste by pre-estimating how much paint you need. Keep the leftover paint for future use so you can effectively reduce the environmental impact.Storage: Cool, frost free and tightly closed
Protection equipment: Spray painting: painting suit, full face mask with combined filter. Painting: eye protection, gloves. Sanding: respiratory protection
Technical Data
Current TDS Version
januar 2021
Replaces TDS Version
oktober 2020